🇪🇬Egypt Africa Planned Storage

Scatec Egypt 1.7 GW Solar-plus-Storage Complex

1.7 GW Hybrid / solar + storage Updated today
Public summary

Scatec has received Egyptian cabinet approval for a 1.7 GW AC solar plant paired with 1,500 MWh of battery storage and around 100 MW of round-the-clock output, together with PPA, grid-connection and land-use approvals with EETC.

Project report

Updated 20 Nov 2026

According to the Global Solar Industry Research Institute under PV Business News, Norwegian renewable energy developer Scatec has received Egyptian cabinet approval to proceed with a large hybrid solar and battery storage project capable of delivering around 100 MW of around-the-clock power output.

The project has a total installed capacity of 1.7 GW measured on the AC side, combining a solar PV plant with a battery system capable of storing 1,500 MWh of energy. Together with additional standalone storage sites, the project's total storage capacity will approach 4 GW of flexible capacity — a scale that places it in the top tier of the Middle East and North Africa market.

To deliver the power, the project includes a 500 kV transmission line and a 600 MVA transformer station connecting the plant to the national grid.

Beyond the main plant, the project includes additional battery storage sites at Abu Qir (1,435 MWh) and Nagaa Hammadi (1,000 MWh). Each storage facility will connect to the national grid through new substations to help ensure stable supply across the country.

According to the cabinet statement, the project will strengthen Egypt's power system, with total battery storage capacity reaching around 4 GW. That will help match grid supply and demand and improve stability as more renewable capacity is connected.

The cabinet also approved the signing of the power purchase agreement (PPA) and grid connection agreement between Scatec and the Egyptian Electricity Transmission Company (EETC), as well as a land-use agreement with the New and Renewable Energy Authority.

The revenue certainty of Egypt's solar-plus-storage projects in recent years rests on long-term PPAs with the state transmission company. A 258.5 MWp solar plant with 120 MWh of storage in the Benban region, for example, locked in long-term cash flows through a 25-year PPA with EETC — the core precondition for the European Bank for Reconstruction and Development to provide up to US$63.5 million in project debt financing. Scatec's deal, with the PPA, grid connection agreement and land-use rights approved together, has moved from negotiation to execution.

Source: PV Business News